About the operation

Operation Calendar

This operation will take place between 17th and 27th May 2002, both included.

We will depart from Barcelona on 16th May in the morning to Paris, where we'll catch our ariplane that will take us to Paris, where we'll change to the plane that will take us to our final destiny: Congo-Brazzaville. We will start the operation as soon as possible.

 

Equipment

Our station will consist in:

  • Yaesu FT-900.
  • ICOM IC-706 MKIIG
  • Hy-gain TH3Jr beam (10-15-20).
  • Cushcraft MA5B beam (10-12-15-17-20)
  • Wire dipoles for 40 and 80 meters.
  • 3 elements yagi (6 meters)
  • Wire dipoles
  • Ameritron AL-811HX. (800 W) linear amplifier.
  • Kantronics KAM Plus
  • 2 laptops.
  • MFJ 4225MV Power supplier.

 

Propagation predictions

Here you can consult the propagation predicted for your area to Comoros

 

EUROPE (North)

EUROPE (South)

USA (East Coast)

USA (West Coast)

SOUTHAMERICA

JAPAN

AUSTRALIA

NEW ZEALAND